Construction, maintenance, current and capital repair and toll operation of the M-11 Moscow-Saint-Petersburg Highway, km 58 –km 149 section (1 и 2 stages).
Building, financing, operation and maintenance of the M-11 Moscow – St.Petersburg highway at the 543–684km section
Construction and Toll Operation of the M-11 Moscow-St. Petersburg Highway at the 208 — 258 km (Section 4)
Building, maintenance, current and capital repair of the M-4 “Don” highway – From Moscow via Voronezh, Rostov-on-Don and Krasnodar to Novorossiysk, Section 517 km – 544 km (bypassing the villages of Novaya Usman and Rogachevka), Voronezh Region